Expo 2020 Dubai
Expo 2020 Dubai, Dubai, United Arab Emirates Client: Dubai Expo 2020 Project Management Consultant: Turner & Townsend, UAE: Peter Day Senior Project Manager Project Role: Seconded into the Dubai Expo 2020 to provide in-house project management services. Primarily leading and coordinating a multi-disciplinary team from across the globe to deliver a number of confidential pavilions and front of house event architecture. |
Contents |
Overview
The World Expo is a global gathering of nations designed to find solutions to pressing challenges of our times. In 2020-2021, the event was scheduled to take place in Dubai from October 2020 - March 2021. Due to the COVID-19 pandemic, the opening was postponed to 1 October 2021.
Event project management
For mainstream and event construction project management, both types of projects require a clearly defined brief, robust project plan, shared success criteria and best practice project management tools and techniques. However, there are some differences in event construction project management processes compared to non-event construction project management.
The event industry differs from the open construction market primarily due to the impermanent nature of the built assets in event construction. Due to this, the responsibilities for the design, installation, maintenance and removal of all scope associated with the built asset tends to fall on the contractor (rather than the typical collection of different organisations and teams). This leads to differences in the way projects are procured, designed and delivered.
There are also subtle contractual differences. While the FIDIC suite of contracts are used in both instances, the transfer of title (and specifically the contractor’s materials and facilities) are often procured on a rental basis in event construction; title of materials and assets does not transfer to the client. This is due to the buildings and infrastructure being constructed on a temporary basis with the contractor’s scope extending into post-handover maintenance and post event removal.
There are also differences in procurement. The Middle East construction market typically favours a traditional procurement practice (full client design competitively tendered and awarded for the lowest price), which may lead to an adversarial environment. Conversely, the event industry uses more collaborative procurement methods such as design and build construction contracts and consultant framework agreements.
Dubai Expo 2020 has successfully adopted these collaborative principles which can be seen by contract sums and payment milestones being set early in the design process. Also, there are strong examples of integrated client, contractor and design teams all formally engaged to work collaboratively throughout the design and delivery process.
Final thoughts
General construction project management strategies such as formally engaging in commercial transparency and team collaboration early on in the delivery process provide projects and team members with the best chance of success across every type of construction project. However, it important to recognise that within each type of construction project there are subtle differences. It is important to be aware of them, be flexible and be adaptable to each individual project in order to succeed.
--ICPMA 09:57, 16 Feb 2021 (BST)
Related articles on Designing Buildings Wiki
Featured articles and news
The continued ISG fall out, where to go?
Support for ISG contractors, companies and employees.
New HES national centre for traditional building retrofit
Announced as HES publishes survey results which reveal strong support for retrofit.
Retrofit of Buildings, a CIOB Technical Publication
Expected to become one of the largest activities in the global construction industry.
The ECA industry focus video channel
Keeping update with the industry session by session.
Over 25 recorded informations sessions freely available.
AT Awards 2024 ceremony East London October 25th.
Revisiting the AT community at the 2023 awards evening.
The Community Housing Fund and built affordable homes
CLTN reviews the impact of the Fund and calls for extension.
The grading system of the Regulator for Social Housing
A background, an explanation and ten recent enforcements.
Construction, repair and maintenance. Book review.
Putting new life into a city with a 1900 year history.
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.